Contact Us

Sales and engineering are handled from Shanghai; production runs in Changsha County, Hunan. Send drawings by email or WhatsApp, or use the RFQ form — engineering reply within 24 hours on business days.

Email sales@castnex.cc

Drawings, RFQs and order documents. Engineering reply within 24 hours on business days.

WhatsApp +86 159 0213 4022

Fastest route for part photos, voice notes and short questions.

Phone +86 159 0213 4022

Mon–Fri, 09:00–18:00 China Standard Time (UTC+8).

Shanghai · Export Hub

Shanghai Export Hub

Office, small-batch production and warehouse. Drawing review, final inspection, packing, consolidation and export documents are handled here.

No. 100, Lane 2868, Sanlu Road
Pujiang Town, Minhang District
Shanghai 201112, China

Hunan · Production Base

Changsha Production Base

Affiliated foundry operating since 2011: sand, investment, die, gravity, low-pressure, lost-foam and centrifugal casting, with heat treatment, machining and inspection.

Langli–Huanghua Industrial Belt
Changsha County, Hunan, China
Visits by appointment, arranged through the Shanghai office.

CASTNEX WeChat QR code

WeChat

Scan to add our sales engineer for quick messaging and quote follow-up — useful for shop-floor photos and voice notes.

Shanghai Export Hub

Map showing CASTNEX Shanghai Export Hub on Sanlu Road, Pujiang Town, Minhang District

Map data © OpenStreetMap contributors

Pre-shipment inspection and consolidation happen at this address. Casting runs at the affiliated foundry in the Langli–Huanghua industrial belt, Changsha County, Hunan, with scheduling, documents and inspection coordinated from the Shanghai office.

Working With Us

What Happens After You Send a Drawing

๐Ÿ“Ž

What to Send

Drawing (PDF / STEP / IGES / DWG), annual volume, target material and any standard the part must meet. If you only have a sample, send photos with key dimensions and we will work from there.

โฑ

Response Time

Engineering reply within 24 hours on business days. Full quotation with tooling cost, unit price and lead time within 3 working days.

๐Ÿญ

Visits & Inspection

Live video walkthrough of the line running your part, on-site audit, or third-party inspection by SGS, BV or TUV at your cost. Visits to the Changsha plant by appointment.

Ready to discuss your casting project?

Share material requirements and estimated quantity for an engineering evaluation; drawings follow by email or WhatsApp.

Request a Quote