Inspection is built into the process, not appended to it: composition before pouring, dimensions after machining, documents before the container is sealed. Certificate scope, issuing body and validity are listed in the document pack issued with every shipment.
Incoming raw material verification and traceability.
Spectrometric analysis to verify alloy composition against grade requirements.
Tensile, hardness and impact testing where specified by the grade or standard.
Coordinate measurement and gauging of critical machining and casting dimensions.
Visual, magnetic particle, penetrant or ultrasonic inspection as applicable.
Process control and verification of any heat treatment performed in-house or by partners.
Final visual, dimensional and documentation review before packaging and shipment.
Documented procedures, records and nonconformity handling across production.
Certificate numbers, issuing bodies, validity and scope are listed here and issued with the pre-shipment document pack for every order.
Quality management system certified to ISO 9001 at the Changsha production base. The certificate copy, scope statement and validity date travel with the order documents, so your quality file is complete before the container ships.
EN 10204 3.1 with heat-number traceability. 3.2 available with a third-party witness.
Inspection report per drawing, first-article report (FAI) on new tooling, CMM data on critical features.
Ultrasonic, magnetic particle or penetrant testing through qualified partners where specified.
Heat treatment and surface treatment records tied to the batch and heat number.
Packing list and photographs of packed goods before the container is sealed.
Claims acknowledged within 48 hours, root cause and containment within 5 working days, replacement or credit per agreement.